Name of plant: Duyen Hai 3 expansion thermal power plant
Location: Duyen Hai, Tra Vinh, Vietnam
Plant’s owner: EVNGENCO 1., a subsidiary of Vietnam Electricity
Capacity: 688 MW
Product: Strainer, valve.
COD: 2020
The Duyen Hai 3 thermal power plant extension utilises a supercritical steam turbine and generator (STG) unit from Toshiba. The plant is equipped with a pulverised coal-fired boiler for generating thermal energy and the selective catalytic reduction (SCR) system for reduction of nitrogen oxides emissions.
The other infrastructure facilities at the plant include a coal handling system, ash handling system, a flue stack, and a switchyard.